12.1 Process flow

Table 31. Process flow and critical control points

Step

Operation

Equipment

Critical control

Capacity

1

Intake and sampling

Weighbridge, probe sampler, moisture meter

Moisture below 8%; visual and rapid aflatoxin screen before offloading

40 t per day in season

2

Drying and storage

Aerated silos with ambient and heated air

Moisture held below 7.5%; temperature monitoring

1,400 t static, four months of cover

3

Shelling and grading

Sheller, destoner, gravity table, size grader

70% kernel recovery; shells diverted to the biomass hopper

1.4 t/hour in shell

4

Colour sorting

Optical colour sorter with infrared channel

Discoloured and shrivelled kernels rejected; the primary aflatoxin control

1.0 t/hour kernel

5

Blanching

Continuous dry blancher

Skin removal; secondary visual defect removal

1.0 t/hour

6

Roasting

Continuous dual-fuel roaster, LPG and shell biomass

Roast colour to specification; time and temperature recorded per batch

1.0 t/hour

7

Milling

Two-stage mill with in-line cooling

Particle size to customer specification

1.0 t/hour

8

Homogenising and de-aeration

Homogeniser, vacuum de-aerator, stabiliser dosing

Oil separation control; texture consistency

1.0 t/hour

9

Chilling and crystallisation

Scraped-surface chiller and holding tanks

Crystallisation profile; product temperature at fill

1.0 t/hour

10

Filling and packing

Retail filler, capper, labeller, coder, case packer; separate pail, drum and IBC station

Fill weight; seal integrity; batch coding

Retail 80 units/min; bulk 6 pails/min

11

Quality release

In-house HPLC and ELISA laboratory

Aflatoxin, moisture, particle size, microbiology; positive release before despatch

Batch-level

12

Warehousing and despatch

Racked ambient warehouse; WMS with lot traceability

First-expiry-first-out; lot recall capability within four hours

900 pallet positions

12.2 Utilities and infrastructure resilience

Ditsobotla Local Municipality has a documented record of electricity and water supply interruption. The plan treats this as an engineering requirement rather than a risk to be disclosed and ignored. R9.4 million of the Phase 1 budget is allocated to utilities, including a 250 kWp rooftop solar photovoltaic installation, standby generation sized to carry the chilling and laboratory loads, and on-site potable and process water storage of 48 hours. The roaster is dual-fuel, running on LPG with shell biomass as a partial substitute, which reduces both cost and exposure to a single energy source.

12.3 Headcount and organisation

Table 32. Headcount and payroll build

Function

FY2029

FY2030

FY2031

FY2032

FY2033

Notes

Executive and management

6

6

7

7

8

Managing director, finance director, operations manager, quality manager, commercial manager, supply chain manager

Supervisory, technical and professional

10

13

15

17

19

Production supervisors, quality technicians, maintenance artisans, accountants, account managers

Operators, warehouse and general

28

34

40

46

50

Two shifts plus intake and warehouse; seasonal contract labour during the intake window

Total direct employees

44

53

62

70

77

Total payroll cost

14

17

21

24

28

R’000, fully loaded including statutory contributions

Output per employee (tonnes)

26.8

34.7

37.7

39.0

39.0

A useful productivity benchmark for a plant of this scale

Net revenue per employee (R million)

1,461

2,035

2,392

2,630

2,777