Magalies Quarry Business Plan — Business Model and Operating Model

Drilling, blasting, crushing and screening, plant configuration and the cost stack behind a delivered tonne.

Section 9 of 26

Business Model and Operating Model

Jump to section

A conventional, well-understood drill-blast-crush-screen operation, executed to a high standard and staged to de-risk commissioning.

Operating process

  1. Drill & blast. Controlled blasting of the norite face on a planned bench sequence, managed for vibration and flyrock compliance.
  2. Load & haul. Excavators and articulated dump trucks move shot rock to the primary crusher.
  3. Crush & screen. Primary, secondary and tertiary crushing with multi-deck screening produces graded stone and dust.
  4. Sand manufacture. A vertical-shaft impactor (VSI) and washing/classification produce specification manufactured sand.
  5. Quality & dispatch. On-site laboratory verifies grading to SANS standards; product is stockpiled and dispatched by weighbridge.

Capacity ramp

Output is staged: an initial line supports ~300 kt in Year 1, rising as the ramp matures; a Phase-2 debottlenecking in Years 2–3 lifts installed capacity to the 720 kt nameplate, reached at full utilisation by Year 5. Staging reduces commissioning risk and aligns capital with demand as it firms.

Production ramp versus installed capacity and utilisation
Figure 1. Production ramp versus installed capacity and utilisation.

Plant and equipment

The processing configuration is a conventional three-stage crushing circuit with a dedicated sand-manufacturing line, sized for the 720 kt nameplate. The principal asset register is summarised below; it forms the basis of the depreciation and sustaining-capital schedules in the financial model.

Asset group

Function

Indicative cost (R’000)

Primary jaw crusher & feeder

First-stage size reduction of shot rock

20,000

Secondary & tertiary cone crushers

Progressive reduction to product sizes

18,000

Vertical-shaft impactor (VSI)

Manufactured-sand production

12,000

Screens, conveyors & wash plant

Grading, classification, sand washing

8,000

Electrical infrastructure (MV line, substation, MCC)

Power reticulation and control

13,000

Mobile fleet (excavators, loaders, ADTs)

Load-and-haul and stockpile handling

33,000

Laboratory & weighbridge

Quality assurance and dispatch control

2,000

Cost structure and operating leverage

Variable cash cost is approximately R72/t at maturity (diesel, power, wear parts, explosives, blasting and mobile-fleet running cost), escalating at 6%. Fixed cost, payroll of about R15m and non-payroll overhead of about R13m at maturity, is largely independent of volume, so unit fixed cost falls sharply as tonnes rise. This operating leverage is the engine of margin expansion.

Full unit cost versus selling price across the ramp
Figure 2. Full unit cost versus selling price across the ramp.