Sable Grid Storage Business Plan — Returns, Scenarios & Sensitivity
Returns have been computed from the re-derived twenty-year cash flow, measured over the fifteen-year contracted term with the re-contracting tail excluded,…
Returns, Scenarios & Sensitivity
Jump to section
- Overview & contents
- Important Notice & Confidentiality
- Executive Summary
- Company Overview & Governance
- Industry & Market Analysis
- Regulatory & Policy Environment
- Market Sizing & Demand Drivers
- Competitive Landscape & Positioning
- Products, Services & Revenue Model
- Project Sizanani, The Flagship Asset
- Technology & Engineering
- Grid Connection & Transmission Access
- Offtake Strategy & Counterparty Risk
- Construction, EPC & Procurement
- Operations, Maintenance & Asset Management
- Implementation Roadmap
- Financial Plan & Projections
- Funding Requirement & Capital Structure
- Returns, Scenarios & Sensitivity
- Risk Analysis & Independent Findings
- SWOT, PESTLE & Strategic Analysis
- Management Team & Organisation
- Transformation, Localisation & ESG
- Investor Returns, Exit & Conclusion
- Annexure A: Detailed Financial Statements
- Annexure B: Assumptions Book
- Annexure C: Scenario & Sensitivity Detail
- Annexure D: Development Pipeline
- Annexure E: Risk Register
- Annexure F: Glossary & Methodology
Returns have been computed from the re-derived twenty-year cash flow, measured over the fifteen-year contracted term with the re-contracting tail excluded, the same conservative convention the sponsor adopts. Because the basis on which returns are measured materially affects the answer, both a commercial-operation basis and a construction-adjusted basis are presented.
17.1 Returns on two bases
|
Metric |
Sponsor stated |
Re-derived from COD |
Construction-adjusted |
|---|---|---|---|
|
Project IRR |
14.2% |
17.28% |
14.48% |
|
Equity IRR |
19.8% |
20.7% |
17.57% |
|
Minimum DSCR (senior, CFADS) |
1.62× |
1.57× |
1.57× |
|
Equity payback |
6.8 years |
5.5 years |
— |
Construction-adjusted, that is, recognising that capital is deployed across an eighteen-month build during which no revenue arises, the re-derived project IRR is 14.5%, against the sponsor’s stated 14.2%. That is an essentially exact reconciliation and confirms that the sponsor’s project return is stated on a construction-adjusted basis. The equity IRR does not reconcile on the same basis: measured from commercial operation the re-derived figure is 20.7%, close to the sponsor’s 19.8%, but adjusted for the construction period on the same convention as the project IRR it falls to 17.6%. The two headline metrics therefore appear to be stated on different bases. Neither figure is wrong, but they are not comparable as presented. On a consistent construction-adjusted basis the equity return is approximately 17.6%, which remains an attractive return for contracted infrastructure but is roughly two percentage points below the headline.
17.2 The shape of the return
The distribution profile explains where the return comes from. Distributions begin modestly, constrained in the early years by mezzanine service and reserve funding, then step up materially from year eight as the mezzanine is repaid, and again from year sixteen when the senior facility is fully amortised. Roughly two-thirds of the cumulative equity return over twenty years arises in the second half of the period. This is characteristic of amortising project finance and has two implications: the return is genuinely long-dated and depends on the asset performing for its full life, and the mid-life refinancing option, releasing trapped equity once operating history exists, is economically significant rather than incidental.
17.3 Scenario analysis
|
Metric |
Downside |
Base |
Upside |
|---|---|---|---|
|
Capacity tariff |
-10% |
R300k/MW/month |
+10% |
|
Capex |
+10% |
R2,050m |
-5% |
|
Availability |
95.0% |
97.5% |
98.5% |
|
Merchant revenue |
Zero |
R14m Year 1 |
2× base |
|
Equity IRR (from COD) |
8.95% |
20.7% |
32.08% |
The Plan states that the combined downside keeps the project above its 1.30x covenant, and on the re-derived model that is broadly correct on the senior test, structural resilience the sponsor is entitled to claim. The equity return in that scenario is another matter. Simultaneous tariff compression of ten percent, a ten percent capital overrun, degraded availability and zero merchant income produce an equity return of approximately 9%, materially below the 12% to 15% typically required for contracted infrastructure equity and below the sponsor’s own downside estimate of 11.9%. The individual stresses are not extreme, a ten percent tariff variance is an ordinary outcome in competitive bidding, and a ten percent capital overrun is within normal construction experience. Investors should understand that the base case requires most things to go approximately as planned, and should form their own view on whether the equity risk premium over the senior debt coupon of 11.5% is adequate compensation.
17.4 Sensitivity
The tornado ranks the drivers unambiguously. The capacity tariff dominates, moving the equity return across a range of roughly sixteen percentage points for a twenty percent swing, and it is the one variable the Company cannot control, because it is set by competitive bidding. Capital cost follows, and is fixed at financial close under the engineering contract. Availability is third, and is the principal variable management actually manages, backed by contractual guarantees. Debt pricing and the accelerated tax allowance follow. The practical conclusion is the one the sponsor draws: once the tariff and capital cost are fixed at financial close, availability becomes the principal managed risk, which is precisely the risk the long-term service agreement is designed to transfer.
17.5 What would have to be true
It is worth stating plainly the conditions on which the base-case return depends. The Company must win a capacity agreement at or near the assumed tariff, in a programme that has been site-specific and against international competitors with lower costs of capital. Construction must complete on the fixed-price contract within eighteen months. Availability must be sustained at 97.5%. The accelerated capital allowance must be available, or the return absorbs the difference. And the maintenance reserve must be corrected so that the year-fourteen augmentation does not compress distributions. None of these is improbable; but they are conjunctive, and the base case assumes all of them hold.