AgriFeed Holdings — Operations & Manufacturing Plan

The milling and manufacturing process, the plant and capacity plan, the technology and equipment, throughput and yield, and the operational performance metrics.

AgriFeed Holdings Business PlanSection 7 › Operations & Manufacturing Plan

Section 7 · Business Plan

Operations & Manufacturing Plan

The milling and manufacturing process, the plant and capacity plan, the technology and equipment, throughput and yield, and the operational performance metrics.

7.1 Site Selection

The Phase 1 site is a 12-hectare brownfield parcel in eMalahleni
(Witbank), Mpumalanga, selected following a multi-criteria assessment of
nine candidate locations across Mpumalanga, Free State, and
KwaZulu-Natal. Selection criteria included: (i) proximity to maize and
oilseed sources (within 250 km of the eastern Highveld grain belt); (ii)
road logistics access (N4 to Komatipoort, N12 to Johannesburg); (iii)
availability of three-phase electrical supply and adequate water; (iv)
proximity to the eastern Highveld broiler and dairy cluster; (v)
emission and zoning compliance; and (vi) commercial proximity to anchor
customers.

7.2 Mill Design & Capacity

The Phase 1 mill will have an installed nameplate capacity of 30 tons
per hour of pelleted feed, equivalent to approximately 220,000 tons per
annum at 85% mill utilisation across two shifts. Year 5 commercial
throughput is modelled at 300,000 tons per annum (full plant utilisation
including selective third-shift operations on peak SKUs). The mill is
being engineered to accommodate Phase 2 capacity addition of an
additional 25 ton-per-hour line in Year 4, lifting installed capacity to
55 t/h and group throughput to 480,000+ t/yr by Year 7.

Process Step Equipment Capacity Vendor (Indicative)
Intake & cleaning Drum cleaner; magnetic separator; aspirator 60 t/h Bühler / Dinnissen
Storage 8 raw material silos (×500 t each = 4,000 t) Top Silo / Sukup
Dosing & batching Multi-component dosing scales; batch mixer 30 t/h Bühler
Grinding Twin hammer mill 30 t/h Andritz / Bühler
Pelleting & cooling Two pellet press lines + counter-flow cooler 30 t/h Andritz
Crumbling & screening Roll crumbler + sifter 15 t/h Andritz
Bagging & dispatch Auto-bagger + palletiser; bulk loadout 30 t/h Premier Tech / OEM
Quality lab ISO/IEC 17025-aligned wet & NIR lab Foss / PerkinElmer
Control system PLC + MES with batch traceability Siemens / Rockwell

7.3 Capex Breakdown

Capex Category Phase 1 (R m) Phase 2 (R m) Total (R m)
Land & site works 55 20 75
Civil and structural works 70 35 105
Process equipment (mill, pelleting) 165 85 250
Storage silos & intake 60 25 85
Bagging, palletising, dispatch 40 15 55
Distribution fleet 50 30 80
ERP, MES, lab equipment & IT 25 10 35
Pre-operating, design, contingency 40 20 60
Working capital provision 45 20 65
TOTAL 550 260 810

7.4 Operating Model

The mill will operate on a 6-day, two-shift baseline, with a third
shift introduced in Year 3 for high-demand SKUs. Direct headcount (mill
operations, lab, dispatch, maintenance) of 87 in Year 1 ramps to 142 by
Year 5; total Group permanent headcount (including sales, technical
advisory, finance, and management) of 132 in Year 1 ramps to 230 by Year
5.

Operating Metric Industry Benchmark AgriFeed Y3 Target AgriFeed Y5 Target
Mill OEE % 70–75% 82% 84%
Energy consumption (kWh/t feed) 55–60 50 48
Direct labour cost per ton (R/t) 180–220 165 155
Quality reject rate (%) 0.8–1.4% 0.6% 0.4%
Bagging error rate (%) 1.2–1.6% 0.8% 0.5%
Dispatch on-time-in-full (%) 92–95% 97% 98.5%
Customer NPS 20–35 55+ 65+
Figure 7.1
Figure 7.1 — Operational benchmarks: South African industry average vs AgriFeed Year 3 target

7.5 Maintenance & Reliability

The maintenance philosophy is preventive-and-predictive: scheduled
overhauls, vibration and thermal monitoring on all critical drives, oil
analysis on gearboxes, and a full annual outage in week 52. The plant is
designed for unplanned downtime below 3.5% per annum (≈300 hours), well
within industry benchmark of 5–6%. Spare-parts strategy is risk-graded:
critical-spares on-site for any item with lead time over 14 days,
consigned spares with vendors for medium-criticality, and a strategic
agreement with the equipment OEM for emergency parts airfreight.

Confidential — this business plan is provided to prospective investors and lenders for evaluation purposes only and may not be reproduced or distributed without the written consent of AgriFeed Holdings (Pty) Ltd.