Thaba Goats Business Plan — Capital Expenditure

The R2.45m capital programme across five stages: breeding stock, fencing, handling facilities, water infrastructure and vehicles.

Capital Expenditure

Jump to section
On this page

  • 16.1 Stage 1 capital in detail
  • 16.2 Later stages
  • 16.3 Stage 2 capital items
  • 16.4 Stage 3 capital items
  • 16.5 Stage 4 capital items
  • 16.6 Stage 5 capital items
Capital deployed by stage
Figure 15. Capital deployed by stage.

R’000

Year 1

Year 2

Year 3

Year 4

Year 5

Infrastructure

266

174

500

473

549

Breeding livestock

103

7

16

26

36

Working capital

58

46

60

65

70

Total capital deployed

427

227

576

564

655

Cumulative

427

654

1 230

1 794

2 449

Of the R2.449 million deployed, R1.962 million is fixed infrastructure, fencing, water, kraals, shelters, handling facilities and transport, R188 000 is breeding livestock and R299 000 is working capital. Only the infrastructure element is depreciated, over a twenty-year life appropriate to fencing and water reticulation. Breeding livestock is carried as a biological asset and revalued through the herd growth line rather than depreciated, and the working capital element funds stock, stores and receivables.

16.1 Stage 1 capital in detail

Item

R’000

Share of stage

Foundation does, 50 head

90

21.1%

Breeding bucks, 2 head

13

3.0%

Perimeter and camp fencing

74

17.3%

Water: borehole equipping, tanks and troughs

70

16.4%

Kraal, night shelter and kidding pens

48

11.2%

Handling facility, crush and scale

28

6.6%

Feed and medicine store

26

6.1%

Registration, veterinary setup and training

20

4.7%

Working capital, first twelve months

58

13.6%

Total Stage 1

427

100.0%

The Stage 1 programme carries the whole of the site establishment, fencing, water, kraal, handling and store, against a herd of just 50 does. Measured per doe that looks ruinous at R8 540 a head. Measured against the 300 does those same assets will serve by Stage 5, it is the cheapest capital in the programme, and it is why the later stages spend almost entirely on camp extension and additional water rather than on establishment.

16.2 Later stages

16.3 Stage 2 capital items

Item

R’000

Share of stage

Additional camp fencing and rotation infrastructure

84

37.0%

Second water point

52

22.9%

Breeding buck, 1 head

7

3.1%

Shelter extension

38

16.7%

Working capital

46

20.3%

Total Stage 2

227

100.0%

16.4 Stage 3 capital items

Item

R’000

Share of stage

Third and fourth camp fencing

168

29.2%

Third water point and reticulation

118

20.5%

Light delivery vehicle and trailer

165

28.6%

Breeding bucks, 2 head

16

2.8%

Kidding pen and shelter extension

49

8.5%

Working capital

60

10.4%

Total Stage 3

576

100.0%

16.5 Stage 4 capital items

Item

R’000

Share of stage

Camp fencing extension to 200 does

152

27.0%

Handling and quarantine facility

128

22.7%

Water storage and reticulation upgrade

134

23.8%

Breeding bucks, 3 head

26

4.6%

Shelter and kraal extension

59

10.5%

Working capital

65

11.5%

Total Stage 4

564

100.0%

16.6 Stage 5 capital items

Item

R’000

Share of stage

Camp fencing extension to 300 does

186

28.4%

Fourth water point and solar pump

164

25.0%

Feed store and lick storage expansion

92

14.0%

Breeding bucks, 4 head

36

5.5%

Shelter, kraal and kidding extension

107

16.3%

Working capital

70

10.7%

Total Stage 5

655

100.0%