Cryostead Logistics — Facility & Operations Plan
The Cryostead facility has been designed by specialist cold chain engineers to meet international standards for temperature-controlled warehousing, with provisions for future expansion:
Section 8 · Business Plan
Facility & Operations Plan
The Cryostead facility has been designed by specialist cold chain engineers to meet international standards for temperature-controlled warehousing, with provisions for future expansion:
12,000 frozen (down to −18 °C) and 6,000 chilled pallet positions of temperature-controlled warehousing.
8.1 Facility Specifications
The Cryostead facility has been designed by specialist cold chain engineers to meet international standards for temperature-controlled warehousing, with provisions for future expansion:
| Specification | Detail |
|---|---|
| Total Warehouse Area | 12,000 m² (gross internal area) |
| Total Pallet Positions | 18,000 (12,000 frozen + 6,000 chilled) |
| Loading Docks | 18 dock levellers with insulated dock shelters |
| Refrigeration System | Ammonia-based industrial system with variable-speed compressors |
| Racking System | Adjustable pallet racking, 5-high in frozen zone, 4-high in chilled zone |
| Backup Power | 2 x 1,500 kVA diesel generators with 72-hour fuel reserves |
| Solar PV System | 500 kWp rooftop installation (Phase 2), estimated 15–20% energy offset |
| Fire Protection | SABS-compliant sprinkler system, gas suppression in electrical rooms |
| Security | 24/7 on-site security, CCTV, biometric access control, perimeter fencing |
| Site Area | 5 hectares (including expansion land for Phase 2) |
8.2 Technology Infrastructure
The facility will incorporate best-in-class warehouse technology systems:
-
Warehouse Management System (WMS): Cloud-based WMS providing real-time inventory tracking, stock rotation management (FIFO/FEFO), and automated client reporting. Integration with major ERP systems (SAP, Oracle, Sage).
-
IoT Temperature Monitoring: Network of wireless temperature sensors across all storage zones, with automated alerting, logging, and compliance reporting. Data accessible to clients via web portal and mobile application.
-
Automated Pallet Handling (Phase 2): Automated guided vehicles (AGVs) and conveyor systems to be deployed in Year 3, reducing labour costs and improving throughput efficiency.
8.3 Staffing Plan
The facility will operate on a three-shift basis (24/7) to accommodate client requirements and maintain continuous temperature management:
| Department | Year 1 | Year 3 | Year 5 |
|---|---|---|---|
| Management | 5 | 7 | 9 |
| Warehouse Operations | 45 | 55 | 60 |
| Technical & Maintenance | 8 | 10 | 12 |
| Sales & Administration | 7 | 10 | 13 |
| Security & Cleaning | 10 | 10 | 12 |
| Total Headcount | 75 | 92 | 106 |
The staffing plan reflects a lean operational model with progressive headcount growth aligned to occupancy increases. Total annual employment costs are projected at ZAR 22.5 million in Year 1, escalating to ZAR 34.8 million in Year 5.
This document contains proprietary and confidential information. Distribution without written consent is prohibited.