6.1 The room build

Year 1

Year 2

Year 3

Year 4

Year 5

Growing rooms

3

4

6

6

6

Rooms added in the year

3

1

2

Shelved area, m²

840

1 120

1 680

1 680

1 680

Crops per room per year

5.4

6.0

6.4

6.6

6.7

Total crops completed

16

24

38

40

40

Yield per m² per crop, kg

21.0

24.0

26.0

27.5

28.5

Contamination loss

16.0%

11.5%

8.5%

7.0%

6.0%

Button sold, kg

75 614

134 882

241 721

267 978

284 963

Oyster sold, kg

6 072

14 217

22 827

29 946

34 110

6.2 Facility and infrastructure

Growing rooms, plant and infrastructure capital
Figure 14. Growing rooms, plant and infrastructure capital.

Item

R

Depreciation life

Note

Six button growing rooms — structure, insulation, shelving

7 600 000

15 years

Phased three, then one, then two; the dominant capital item

Climate control, air handling and filtration

3 400 000

10 years

Temperature, humidity, CO2 and filtered air with positive pressure

Oyster house — pasteurisation, inoculation, fruiting rooms

2 150 000

12 years

Includes clean room for inoculation, the highest-risk step for contamination

Cold room, packhouse and cold chain vehicle

1 780 000

8 years

Non-negotiable given five to seven day shelf life

Solar, backup generation and water

1 320 000

10 years

Climate control failure loses a crop, not merely a day’s trading

Site works, roads, biosecurity and fencing

620 000

15 years

One-directional clean-to-dirty workflow designed into the layout

Technical advisory and pre-operating costs

480 000

3 years

Imported growing expertise through the first two crops

Total facility and infrastructure

17 350 000

Growing rooms and climate control together are 63 per cent of the capital budget, and both must be complete before a single mushroom is sold. The cold room, packhouse and delivery vehicle are front-loaded because a five-to-seven day shelf life makes the cold chain a condition of trading rather than an efficiency. Site works are front-loaded for the same reason: one-directional clean-to-dirty workflow has to be designed into the layout, not retrofitted around it.

6.3 The crop cycle

Stage

What happens

Where the risk sits

Cook-out

The emptied room is steam-sterilised before refilling

Skipping or shortening it lets a contaminated crop seed the next one. It costs turnaround days, which is exactly why it gets shortened

Fill and spawn run

Phase III spawned compost is loaded to the shelves and held at spawn-run conditions

Compost quality determines the ceiling on this crop. Nothing later recovers a poor delivery

Casing

Casing layer applied and managed to trigger pinning

The most skill-dependent step, and where imported technical advice earns its cost

Pinning and fruiting

Environmental control brings the crop through successive flushes

Several hours without climate control loses the crop. This is what backup power protects

Harvest

Picking to grade across two or three flushes

Picking discipline affects both yield and grade. Over-mature product downgrades

Cool and pack

Immediate cooling, grading and packing in the packhouse

Field heat not removed quickly costs shelf life at the far end

Despatch

Cold chain to wholesale, retail or restaurant within hours

Five to seven days from here. Unsold product is loss, not inventory