Green Master Vegetables Business Plan — Open Field Versus Tunnels

The economics of each system compared on capital, yield, risk and season, and why the plan runs both rather than choosing one.

Open Field Versus Tunnels

Jump to section
Gross margin per hectare by production system, Year 5
Figure 5. Gross margin per hectare by production system, Year 5.

Open field

Tunnels

Gross margin per hectare, Year 5

R53’000

R1 460’000

Yield per hectare per crop, Year 5

32 t

100 t

Crops per year

1.8

1.9

Establishment cost per hectare

Roughly R65’000 for drip and land preparation

Roughly R460’000 for structure, drip and fittings

Return on establishment cost

82%

317%

Typical crops

Cabbage, butternut, onion, beetroot, sweet potato

Tomato, sweet pepper, cucumber

Weather exposure

Full. Hail, frost, heat and wind all hit the crop

Substantially protected

Skill required

Moderate

High. A tunnel crop failure is expensive and fast

Area in the plan, Year 5

40.5 ha

4.5 ha

Share of Year 5 gross margin

24.7%

75.4%

Area by production system and tonnage
Figure 6. Area by production system and tonnage.

Ten per cent of the planted area produces 75 per cent of the gross margin. That single sentence is the most important fact about the production system, and it explains why every gate in Section 10 is about adding tunnel area safely rather than adding hectares quickly.

5.1 What would change the ratio

Condition

Evidence required

Consequence

Three seasons of tunnel crops within 10% of yield plan

Recorded yields by tunnel and by crop

The skill objection falls away; accelerate tunnel area

A contracted offtake for tunnel crops

A signed retail or processor agreement at agreed volumes

The concentration objection falls away; price risk is transferred

Grant or concessional funding for structures

An approved Blended Finance or CASP allocation for tunnels specifically

The capital objection falls away; build ahead of cash flow

Water confirmed well above requirement

Independent assessment showing surplus capacity

Tunnels use less water per tonne than open field; surplus favours them

Persistent open-field weather losses

Two seasons of hail, frost or heat damage on record

The risk comparison shifts decisively toward protection

Any two of those conditions together would justify doubling the tunnel programme. None of them can be assumed at the outset, which is why the plan builds the evidence before it builds the structures.